The primary reason is cost. Per the Engineer’s Master Plan report, low-pressure sewers (with grinder pumps) will cost the Hideout $25.5 million LESS than replacing the gravity system in kind. This is mainly due to the depth of excavations needed to run gravity sewer mains through the hilly terrain of the Hideout.

























